Seeking a challenging career in CONSTRUCTION CIVIL ENGINEERING Field where I can utilize my technical background and expertise on execution of buildings and infrastructure utility. Dedicated civil engineer with 12 years experience skilled in all phases of engineering operations. consistently finishes projects under budget and ahead of schedule. Forward thinking professional familiar with all aspects of construction.
Career highlights
Senior civil engineer: Civil Engineer with 12+ years experiance (BSc, MMUP certified) , Proficient in Primavera P6 , SAP ,auto cad and Structural Inspector with expertise in quality assurance, field testing, and structural analysis for major infrastructure and building projects. Experienced in subcontractor management, decision-making under pressure, and risk assessment techniques to secure project compliance and safety. Notable achievement: identified and resolved a structural design issue during inspection, preventing costly delays and ensuring on-time delivery. I am eager to bring innovation, precision, and leadership to inspection and quality-focused roles.
Key skills
Professional experience
Provided technical expertise throughout all phases of the project, ensuring accurate execution of designs and specifications. • Maintained records for each project and engineering discipline. • Monitored installation of materials and equipment for compliance with drawings and specifications. • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines. • PROJECT: DESIGN AND BUILD FOR DATA CENTRE 1 - QATAR FREE ZONE • Approximate of built up area ( 9000m2) short description for the project Installation, testing and commissioning of two floor steel structure and its facilities • Reduced construction delays through proactive risk identification and mitigation strategies.
- Provided technical expertise throughout all phases of the project, ensuring accurate execution of designs and specifications.
- Maintained records for each project and engineering discipline.
- Monitored installation of materials and equipment for compliance with drawings and specifications.
- Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.
- PROJECT: DESIGN AND BUILD FOR DATA CENTRE 1 - QATAR FREE ZONE
- Approximate of built up area ( 9000m2) short description for the project Installation, testing and commissioning of two floor steel structure and its facilities
- Reduced construction delays through proactive risk identification and mitigation strategies.
Provided technical expertise throughout all phases of the project, ensuring accurate execution of designs and specifications. • Maintained records for each project and engineering discipline. • Monitored installation of materials and equipment for compliance with drawings and specifications. • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines. • PROJECT: DESIGN AND BUILD FOR DATA CENTRE 1 - QATAR FREE ZONE • Approximate of built up area ( 9000m2) short description for the project Installation, testing and commissioning of two floor steel structure and its facilities • Reduced construction delays through proactive risk identification and mitigation strategies.
- Provided technical expertise throughout all phases of the project, ensuring accurate execution of designs and specifications.
- Maintained records for each project and engineering discipline.
- Monitored installation of materials and equipment for compliance with drawings and specifications.
- Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.
- PROJECT: DESIGN AND BUILD FOR DATA CENTRE 1 - QATAR FREE ZONE
- Approximate of built up area ( 9000m2) short description for the project Installation, testing and commissioning of two floor steel structure and its facilities
- Reduced construction delays through proactive risk identification and mitigation strategies.
PROJECT: DESIGN AND BUILD FOR MODIFICATION AND ADDITIONAL WORKS TO EXISTING ( 27 ) SCHOOLS • Approximate of built up area ( 1600m2) short description for the project Installation, testing and commissioning of the precast structure & renovation FLS plan for the existing building (school) • PROJECT: STEEL STRUCTURE FOR OPEN YARD AT KAHRAMAA 1- WAREHOUSE • Approximate of built up area (24000m2) short description for the project construction Installation, testing and commissioning of the steel structure warehouses • Major responsibilities: Completion all stages of civil works for the warehouses and its facilities from substructure to superstructure stages, infrastructure utility (ELECTRICAL MANHOLES, DRAINAGE MANHOLES, SOKAWAYS, ROAD GULLY, ROAD PAVEMENT, ROAD MAINTENANCE AND SIDEWALKWAYS) were achieved in high quality finishing as well • Conceptualized new V.I.B visitors parade for Army Military College at Duhailiyat. • Approximate of built up area (7500m2) short description for the project construction installation, testing and commissioning of the steel structure V.I.B building with associated facilities • Major responsibilities: Execution all stages of civil works included substructure (foundations infrastructure) and superstructure (erection steel structure, building block, casting concrete of ground slabs .etc.) and all facilities like (ELEC.AND MECH MANHOLES, SOKAWAYS, ROAD GULLY ASPHALT PAVEMENT AND WALK WAY) • PROJECT: TEMPORARY PACKAGE TREATMENT PLANTS AT AL KARAANAA & UMM BARKAH • Major responsibilities: Perform all inspection and tests to achieve drawings details, specification according TO ITPS AND QCS • Checking quality of work during and end of each activities according to ITB of project and QCS • PROJECT: BUSINESS AND RECREATION COMPLEX PACKAGE 1 AT MUSAIEED INDUSTRIAL CITY (MIC) • Short description of project the overall project comprises the procurement, construction, installation testing and commissioning of the main recreation club building with associated community facilities and the infrastructure at the approximate built-up area (28000m2) of the buildings and divided into 3 zones A, B, C and pyramid building as entrance of project • Major responsibilities: Zone (C): Execution of structural and architectural drawings of (prayer rooms, video games room, toilets, squash stadium, multi-purpose sports hall and bowling stadium) from casting the foundations to finishing phase including infrastructure utility • Zone (A): Execution of structural drawings of (indoor Olympics swimming pool and outdoor swimming pool, gym, restaurant) • Zone (B): Execution of structural and architectural drawings of (conference hall, main kitchen) • Execution and casting self • Compacting concrete for PYRAMID (reinforcement concrete building for 20m height) • Execution of infrastructure, soft and hard landscape areas • Reduced construction costs through effective negotiation with suppliers and subcontractors. • Monitored execution of contract work for compliance with design plans and specifications.
- PROJECT: DESIGN AND BUILD FOR MODIFICATION AND ADDITIONAL WORKS TO EXISTING ( 27 ) SCHOOLS
- Approximate of built up area ( 1600m2) short description for the project Installation, testing and commissioning of the precast structure & renovation FLS plan for the existing building (school)
- PROJECT: STEEL STRUCTURE FOR OPEN YARD AT KAHRAMAA 1- WAREHOUSE
- Approximate of built up area (24000m2) short description for the project construction Installation, testing and commissioning of the steel structure warehouses
- Major responsibilities: Completion all stages of civil works for the warehouses and its facilities from substructure to superstructure stages, infrastructure utility (ELECTRICAL MANHOLES, DRAINAGE MANHOLES, SOKAWAYS, ROAD GULLY, ROAD PAVEMENT, ROAD MAINTENANCE AND SIDEWALKWAYS) were achieved in high quality finishing as well
- Conceptualized new V.I.B visitors parade for Army Military College at Duhailiyat.
- Approximate of built up area (7500m2) short description for the project construction installation, testing and commissioning of the steel structure V.I.B building with associated facilities
- Major responsibilities: Execution all stages of civil works included substructure (foundations infrastructure) and superstructure (erection steel structure, building block, casting concrete of ground slabs .etc.) and all facilities like (ELEC.AND MECH MANHOLES, SOKAWAYS, ROAD GULLY ASPHALT PAVEMENT AND WALK WAY)
- PROJECT: TEMPORARY PACKAGE TREATMENT PLANTS AT AL KARAANAA & UMM BARKAH
- Major responsibilities: Perform all inspection and tests to achieve drawings details, specification according TO ITPS AND QCS
- Checking quality of work during and end of each activities according to ITB of project and QCS
- PROJECT: BUSINESS AND RECREATION COMPLEX PACKAGE 1 AT MUSAIEED INDUSTRIAL CITY (MIC)
- Short description of project the overall project comprises the procurement, construction, installation testing and commissioning of the main recreation club building with associated community facilities and the infrastructure at the approximate built-up area (28000m2) of the buildings and divided into 3 zones A, B, C and pyramid building as entrance of project
- Major responsibilities: Zone (C): Execution of structural and architectural drawings of (prayer rooms, video games room, toilets, squash stadium, multi-purpose sports hall and bowling stadium) from casting the foundations to finishing phase including infrastructure utility
- Zone (A): Execution of structural drawings of (indoor Olympics swimming pool and outdoor swimming pool, gym, restaurant)
- Zone (B): Execution of structural and architectural drawings of (conference hall, main kitchen)
- Execution and casting self
- Compacting concrete for PYRAMID (reinforcement concrete building for 20m height)
- Execution of infrastructure, soft and hard landscape areas
- Reduced construction costs through effective negotiation with suppliers and subcontractors.
- Monitored execution of contract work for compliance with design plans and specifications.
Education